{"id":4226,"date":"2026-09-22T00:00:00","date_gmt":"2026-09-22T00:00:00","guid":{"rendered":"https:\/\/chac-electric.com\/?p=4226"},"modified":"2026-09-18T08:01:47","modified_gmt":"2026-09-18T08:01:47","slug":"which-type-of-circuit-breaker-is-designed-to-be-reconditioned","status":"publish","type":"post","link":"https:\/\/chac-electric.com\/vi\/blog\/which-type-of-circuit-breaker-is-designed-to-be-reconditioned\/","title":{"rendered":"Lo\u1ea1i aptomat n\u00e0o \u0111\u01b0\u1ee3c thi\u1ebft k\u1ebf \u0111\u1ec3 c\u00f3 th\u1ec3 t\u00e1i ch\u1ebf\/t\u00e2n trang l\u1ea1i?"},"content":{"rendered":"<p>When a project role faced a selection problem, the visible failure often appeared before the real cause was understood. Luis, a maintenance lead in Monterrey, found a low-voltage draw-out breaker with pitted contacts after a fault event. A rushed repaint would have hidden the damage; a documented inspection, parts review and injection test showed the breaker could be reconditioned within its original design limits.<\/p>\n<p><strong>T\u00f3m t\u1eaft:<\/strong> Low-voltage power circuit breakers\u2014especially serviceable draw-out designs\u2014are the devices most commonly considered for reconditioning. Reconditioning is not cosmetic repair: it requires condition assessment, approved replacement parts, calibrated testing and a recorded decision on remaining life. Follow the original manufacturer instructions and applicable maintenance guidance. This article keeps the decision evidence-led and separates product capability from installation responsibility.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/chac-electric.com\/wp-content\/uploads\/2026\/09\/which-type-of-circuit-breaker-is-designed-to-be-reconditioned-featured-v2-200k.webp\" alt=\"Which Type Of Circuit Breaker Is Designed To Be Reconditioned featured application\" loading=\"eager\"\/><\/p>\n<h2>Assess condition and parts availability<\/h2>\n<p>C\u00e2u tr\u1ea3 l\u1eddi \u0111\u00fang b\u1eaft \u0111\u1ea7u t\u1eeb ranh gi\u1edbi \u1ee9ng d\u1ee5ng. H\u00e3y x\u00e1c \u0111\u1ecbnh ngu\u1ed3n, t\u1ea3i, d\u00e2y d\u1eabn, m\u1ee9c \u0111\u1ed9 s\u1ef1 c\u1ed1 v\u00e0 m\u00f4i tr\u01b0\u1eddng v\u1eadn h\u00e0nh tr\u01b0\u1edbc khi so s\u00e1nh c\u00e1c catalogue. M\u1ed9t thi\u1ebft b\u1ecb tr\u00f4ng c\u00f3 v\u1ebb ph\u00f9 h\u1ee3p v\u1ec1 \u0111\u1ecbnh m\u1ee9c d\u00f2ng \u0111i\u1ec7n v\u1eabn c\u00f3 th\u1ec3 h\u1ecfng v\u1ec1 kh\u1ea3 n\u0103ng ch\u1ecbu h\u1ed3 quang, t\u00ednh ch\u1ecdn l\u1ecdc, nhi\u1ec7t \u0111\u1ed9 ho\u1eb7c ph\u01b0\u01a1ng ph\u00e1p l\u1eafp \u0111\u1eb7t. H\u00e3y s\u1eed d\u1ee5ng \u0111\u01b0\u1eddng cong th\u1eddi gian-d\u00f2ng \u0111i\u1ec7n c\u1ee7a nh\u00e0 s\u1ea3n xu\u1ea5t v\u00e0 ti\u00eau chu\u1ea9n \u0111i d\u00e2y \u0111\u01b0\u1ee3c \u00e1p d\u1ee5ng l\u00e0m ng\u00f4n ng\u1eef chung gi\u1eefa thi\u1ebft k\u1ebf, mua s\u1eafm v\u00e0 ch\u1ea1y th\u1eed.<\/p>\n<p>L\u1eadp t\u00e0i li\u1ec7u v\u1ec1 c\u00e1c gi\u1ea3 \u0111\u1ecbnh v\u00e0 ki\u1ec3m tra ch\u00fang t\u1ea1i t\u1ee7 \u0111i\u1ec7n. V\u00ed d\u1ee5, m\u1ed9t nghi\u00ean c\u1ee9u v\u1ec1 b\u1ea3o v\u1ec7 c\u1ea7n n\u00eau r\u00f5 d\u00f2ng \u0111i\u1ec7n ng\u1eafn m\u1ea1ch d\u1ef1 ki\u1ebfn, d\u00f2ng \u0111i\u1ec7n kh\u1edfi \u0111\u1ed9ng (inrush) d\u1ef1 ki\u1ebfn, kh\u1ea3 n\u0103ng mang d\u00f2ng c\u1ee7a d\u00e2y d\u1eabn v\u00e0 th\u1eddi gian c\u1eaft y\u00eau c\u1ea7u. C\u00e1c ph\u01b0\u01a1ng ph\u00e1p c\u00f3 t\u00ean g\u1ecdi c\u1ee5 th\u1ec3 nh\u01b0 th\u1eed nghi\u1ec7m ti\u00eam d\u00f2ng s\u01a1 c\u1ea5p, th\u1eed nghi\u1ec7m \u0111i\u1ec7n tr\u1edf c\u00e1ch \u0111i\u1ec7n ho\u1eb7c nghi\u00ean c\u1ee9u ph\u1ed1i h\u1ee3p s\u1ebd h\u1eefu \u00edch h\u01a1n so v\u1edbi m\u1ed9t tuy\u00ean b\u1ed1 chung chung r\u1eb1ng m\u1ed9t s\u1ea3n ph\u1ea9m \u0111\u1ea1t \u201cc\u1ea5p \u0111\u1ed9 c\u00f4ng nghi\u1ec7p.\u201d<\/p>\n<h3>Stage<\/h3>\n<p>Use this checkpoint to keep the specification testable. If the answer changes with destination market, voltage system or utilization category, say so in the specification and obtain written confirmation before release.<\/p>\n<h2>Use a controlled reconditioning process<\/h2>\n<p>C\u00e2u tr\u1ea3 l\u1eddi \u0111\u00fang b\u1eaft \u0111\u1ea7u t\u1eeb ranh gi\u1edbi \u1ee9ng d\u1ee5ng. H\u00e3y x\u00e1c \u0111\u1ecbnh ngu\u1ed3n, t\u1ea3i, d\u00e2y d\u1eabn, m\u1ee9c \u0111\u1ed9 s\u1ef1 c\u1ed1 v\u00e0 m\u00f4i tr\u01b0\u1eddng v\u1eadn h\u00e0nh tr\u01b0\u1edbc khi so s\u00e1nh c\u00e1c catalogue. M\u1ed9t thi\u1ebft b\u1ecb tr\u00f4ng c\u00f3 v\u1ebb ph\u00f9 h\u1ee3p v\u1ec1 \u0111\u1ecbnh m\u1ee9c d\u00f2ng \u0111i\u1ec7n v\u1eabn c\u00f3 th\u1ec3 h\u1ecfng v\u1ec1 kh\u1ea3 n\u0103ng ch\u1ecbu h\u1ed3 quang, t\u00ednh ch\u1ecdn l\u1ecdc, nhi\u1ec7t \u0111\u1ed9 ho\u1eb7c ph\u01b0\u01a1ng ph\u00e1p l\u1eafp \u0111\u1eb7t. H\u00e3y s\u1eed d\u1ee5ng \u0111\u01b0\u1eddng cong th\u1eddi gian-d\u00f2ng \u0111i\u1ec7n c\u1ee7a nh\u00e0 s\u1ea3n xu\u1ea5t v\u00e0 ti\u00eau chu\u1ea9n \u0111i d\u00e2y \u0111\u01b0\u1ee3c \u00e1p d\u1ee5ng l\u00e0m ng\u00f4n ng\u1eef chung gi\u1eefa thi\u1ebft k\u1ebf, mua s\u1eafm v\u00e0 ch\u1ea1y th\u1eed.<\/p>\n<p>L\u1eadp t\u00e0i li\u1ec7u v\u1ec1 c\u00e1c gi\u1ea3 \u0111\u1ecbnh v\u00e0 ki\u1ec3m tra ch\u00fang t\u1ea1i t\u1ee7 \u0111i\u1ec7n. V\u00ed d\u1ee5, m\u1ed9t nghi\u00ean c\u1ee9u v\u1ec1 b\u1ea3o v\u1ec7 c\u1ea7n n\u00eau r\u00f5 d\u00f2ng \u0111i\u1ec7n ng\u1eafn m\u1ea1ch d\u1ef1 ki\u1ebfn, d\u00f2ng \u0111i\u1ec7n kh\u1edfi \u0111\u1ed9ng (inrush) d\u1ef1 ki\u1ebfn, kh\u1ea3 n\u0103ng mang d\u00f2ng c\u1ee7a d\u00e2y d\u1eabn v\u00e0 th\u1eddi gian c\u1eaft y\u00eau c\u1ea7u. C\u00e1c ph\u01b0\u01a1ng ph\u00e1p c\u00f3 t\u00ean g\u1ecdi c\u1ee5 th\u1ec3 nh\u01b0 th\u1eed nghi\u1ec7m ti\u00eam d\u00f2ng s\u01a1 c\u1ea5p, th\u1eed nghi\u1ec7m \u0111i\u1ec7n tr\u1edf c\u00e1ch \u0111i\u1ec7n ho\u1eb7c nghi\u00ean c\u1ee9u ph\u1ed1i h\u1ee3p s\u1ebd h\u1eefu \u00edch h\u01a1n so v\u1edbi m\u1ed9t tuy\u00ean b\u1ed1 chung chung r\u1eb1ng m\u1ed9t s\u1ea3n ph\u1ea9m \u0111\u1ea1t \u201cc\u1ea5p \u0111\u1ed9 c\u00f4ng nghi\u1ec7p.\u201d<\/p>\n<h3>Typical evidence<\/h3>\n<p>Use this checkpoint to keep the specification testable. If the answer changes with destination market, voltage system or utilization category, say so in the specification and obtain written confirmation before release.<\/p>\n<h2>Prove performance before return to service<\/h2>\n<p>C\u00e2u tr\u1ea3 l\u1eddi \u0111\u00fang b\u1eaft \u0111\u1ea7u t\u1eeb ranh gi\u1edbi \u1ee9ng d\u1ee5ng. H\u00e3y x\u00e1c \u0111\u1ecbnh ngu\u1ed3n, t\u1ea3i, d\u00e2y d\u1eabn, m\u1ee9c \u0111\u1ed9 s\u1ef1 c\u1ed1 v\u00e0 m\u00f4i tr\u01b0\u1eddng v\u1eadn h\u00e0nh tr\u01b0\u1edbc khi so s\u00e1nh c\u00e1c catalogue. M\u1ed9t thi\u1ebft b\u1ecb tr\u00f4ng c\u00f3 v\u1ebb ph\u00f9 h\u1ee3p v\u1ec1 \u0111\u1ecbnh m\u1ee9c d\u00f2ng \u0111i\u1ec7n v\u1eabn c\u00f3 th\u1ec3 h\u1ecfng v\u1ec1 kh\u1ea3 n\u0103ng ch\u1ecbu h\u1ed3 quang, t\u00ednh ch\u1ecdn l\u1ecdc, nhi\u1ec7t \u0111\u1ed9 ho\u1eb7c ph\u01b0\u01a1ng ph\u00e1p l\u1eafp \u0111\u1eb7t. H\u00e3y s\u1eed d\u1ee5ng \u0111\u01b0\u1eddng cong th\u1eddi gian-d\u00f2ng \u0111i\u1ec7n c\u1ee7a nh\u00e0 s\u1ea3n xu\u1ea5t v\u00e0 ti\u00eau chu\u1ea9n \u0111i d\u00e2y \u0111\u01b0\u1ee3c \u00e1p d\u1ee5ng l\u00e0m ng\u00f4n ng\u1eef chung gi\u1eefa thi\u1ebft k\u1ebf, mua s\u1eafm v\u00e0 ch\u1ea1y th\u1eed.<\/p>\n<p>L\u1eadp t\u00e0i li\u1ec7u v\u1ec1 c\u00e1c gi\u1ea3 \u0111\u1ecbnh v\u00e0 ki\u1ec3m tra ch\u00fang t\u1ea1i t\u1ee7 \u0111i\u1ec7n. V\u00ed d\u1ee5, m\u1ed9t nghi\u00ean c\u1ee9u v\u1ec1 b\u1ea3o v\u1ec7 c\u1ea7n n\u00eau r\u00f5 d\u00f2ng \u0111i\u1ec7n ng\u1eafn m\u1ea1ch d\u1ef1 ki\u1ebfn, d\u00f2ng \u0111i\u1ec7n kh\u1edfi \u0111\u1ed9ng (inrush) d\u1ef1 ki\u1ebfn, kh\u1ea3 n\u0103ng mang d\u00f2ng c\u1ee7a d\u00e2y d\u1eabn v\u00e0 th\u1eddi gian c\u1eaft y\u00eau c\u1ea7u. C\u00e1c ph\u01b0\u01a1ng ph\u00e1p c\u00f3 t\u00ean g\u1ecdi c\u1ee5 th\u1ec3 nh\u01b0 th\u1eed nghi\u1ec7m ti\u00eam d\u00f2ng s\u01a1 c\u1ea5p, th\u1eed nghi\u1ec7m \u0111i\u1ec7n tr\u1edf c\u00e1ch \u0111i\u1ec7n ho\u1eb7c nghi\u00ean c\u1ee9u ph\u1ed1i h\u1ee3p s\u1ebd h\u1eefu \u00edch h\u01a1n so v\u1edbi m\u1ed9t tuy\u00ean b\u1ed1 chung chung r\u1eb1ng m\u1ed9t s\u1ea3n ph\u1ea9m \u0111\u1ea1t \u201cc\u1ea5p \u0111\u1ed9 c\u00f4ng nghi\u1ec7p.\u201d<\/p>\n<h3>Stop condition<\/h3>\n<p>Use this checkpoint to keep the specification testable. If the answer changes with destination market, voltage system or utilization category, say so in the specification and obtain written confirmation before release.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/chac-electric.com\/wp-content\/uploads\/2026\/09\/which-type-of-circuit-breaker-is-designed-to-be-reconditioned-product-200k.webp\" alt=\"CHAC Which Type Of Circuit Breaker Is Designed To Be Reconditioned product reference\" loading=\"lazy\"\/><\/p>\n<h2>So s\u00e1nh cho m\u1ed9t th\u00f4ng s\u1ed1 k\u1ef9 thu\u1eadt c\u00f3 t\u00ednh b\u1ea3o v\u1ec7<\/h2>\n<table>\n<thead>\n<tr>\n<th>K\u00edch th\u01b0\u1edbc<\/th>\n<th>L\u1ef1a ch\u1ecdn A<\/th>\n<th>Ph\u01b0\u01a1ng \u00e1n B<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Inspection<\/td>\n<td>Contact wear, insulation, mechanism<\/td>\n<td>Cracks, carbonization or distortion<\/td>\n<\/tr>\n<tr>\n<td>Repair<\/td>\n<td>Approved parts and torque records<\/td>\n<td>Unverified substitute parts<\/td>\n<\/tr>\n<tr>\n<td>Testing<\/td>\n<td>Insulation, timing and primary injection<\/td>\n<td>Trip values outside tolerance<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>C\u00e1c ho\u1ea1t \u0111\u1ed9ng l\u1ef1a ch\u1ecdn v\u00e0 mua s\u1eafm<\/h2>\n<ol>\n<li>\u0110\u00f3ng b\u0103ng c\u00e1c gi\u1ea3 \u0111\u1ecbnh v\u1ec1 \u0111i\u1ec7n: \u0111i\u1ec7n \u00e1p h\u1ec7 th\u1ed1ng, s\u1ed1 c\u1ef1c, d\u00f2ng t\u1ea3i, ph\u01b0\u01a1ng ph\u00e1p d\u1eabn \u0111i\u1ec7n, d\u00f2ng s\u1ef1 c\u1ed1 v\u00e0 gi\u1edbi h\u1ea1n nhi\u1ec7t \u0111\u1ed9 m\u00f4i tr\u01b0\u1eddng.<\/li>\n<li>Y\u00eau c\u1ea7u d\u1eef li\u1ec7u theo d\u00f2ng s\u1ea3n ph\u1ea9m: phi\u00ean b\u1ea3n ti\u00eau chu\u1ea9n, \u0111\u01b0\u1eddng \u0111\u1eb7c t\u00ednh d\u00f2ng c\u1eaft, kh\u1ea3 n\u0103ng ng\u1eaft, gi\u1edbi h\u1ea1n c\u1ef1c \u0111\u1ea5u d\u00e2y, k\u00edch th\u01b0\u1edbc v\u00e0 b\u1eb1ng ch\u1ee9ng th\u1eed nghi\u1ec7m.<\/li>\n<li>Xem x\u00e9t vi\u1ec7c ph\u1ed1i h\u1ee3p v\u1edbi c\u00e1c thi\u1ebft b\u1ecb th\u01b0\u1ee3ng ngu\u1ed3n v\u00e0 h\u1ea1 ngu\u1ed3n; kh\u00f4ng suy lu\u1eadn t\u00ednh ch\u1ecdn l\u1ecdc t\u1eeb nh\u00e3n hi\u1ec7u ho\u1eb7c k\u00edch th\u01b0\u1edbc khung.<\/li>\n<li>Ph\u00ea duy\u1ec7t m\u1eabu ho\u1eb7c b\u00e0i vi\u1ebft \u0111\u1ea7u ti\u00ean, ghi l\u1ea1i l\u1ef1c si\u1ebft v\u00e0 c\u00e1c \u0111i\u1ec3m ki\u1ec3m tra, \u0111\u1ed3ng th\u1eddi x\u00e1c \u0111\u1ecbnh ai l\u00e0 ng\u01b0\u1eddi th\u1ef1c hi\u1ec7n c\u00e1c b\u00e0i ki\u1ec3m tra ch\u1ea1y th\u1eed.<\/li>\n<li>L\u1eadp k\u1ebf ho\u1ea1ch ph\u1ee5 t\u00f9ng v\u00e0 qu\u1ea3n l\u00fd thay \u0111\u1ed5i \u0111\u1ec3 vi\u1ec7c thay th\u1ebf sau n\u00e0y kh\u00f4ng l\u00e0m thay \u0111\u1ed5i \u00e2m th\u1ea7m hi\u1ec7u su\u1ea5t an to\u00e0n.<\/li>\n<\/ol>\n<p>\u0110\u1ed1i v\u1edbi nh\u1eefng ng\u01b0\u1eddi mua \u0111ang so s\u00e1nh c\u00e1c d\u00f2ng s\u1ea3n ph\u1ea9m b\u1ea3o v\u1ec7 c\u00f3 th\u1ec3 c\u1ea5u h\u00ecnh, CHAC Electric cung c\u1ea5p th\u00f4ng tin c\u00f4ng khai v\u1ec1 <a href=\"https:\/\/chac-electric.com\/vi\/mcb\/\"><strong>C\u00e1c s\u1ea3n ph\u1ea9m MCB<\/strong><\/a> v\u00e0 <a href=\"https:\/\/chac-electric.com\/vi\/thiet-bi-phan-phoi-dien\/\"><strong>thi\u1ebft b\u1ecb ph\u00e2n ph\u1ed1i \u0111i\u1ec7n<\/strong><\/a>. H\u00e3y coi c\u00e1c trang n\u00e0y l\u00e0 \u0111i\u1ec3m kh\u1edfi \u0111\u1ea7u v\u00e0 x\u00e1c nh\u1eadn d\u1eef li\u1ec7u m\u00f4 h\u00ecnh ch\u00ednh x\u00e1c cho d\u1ef1 \u00e1n c\u1ee7a b\u1ea1n.<\/p>\n<p><!-- second-round-optimization --><\/p>\n<h2>Separate reconditioning evidence from replacement economics<\/h2>\n<p>A <a href=\"https:\/\/chac-electric.com\/vi\/mccb\/\"><strong>reconditioned circuit breaker<\/strong><\/a> should be accepted only when its frame, mechanism and insulation system can be identified and tested. The right <a href=\"https:\/\/chac-electric.com\/vi\/thiet-bi-phan-phoi-dien\/\"><strong>circuit breaker testing<\/strong><\/a> plan records visual inspection, insulation resistance, contact resistance, mechanical operation and trip performance against the applicable manufacturer data. Make the <strong>replacement decision<\/strong> explicit when parts are obsolete, the interrupting duty is uncertain or the enclosure has suffered heat damage.<\/p>\n<p>Reconditioning is therefore a condition-based engineering decision, not a cosmetic cleaning exercise. Keep serial numbers, test instruments, calibration status and acceptance limits with the service record.<\/p>\n<p>B\u00e0i vi\u1ebft li\u00ean quan: <a href=\"https:\/\/chac-electric.com\/vi\/?p=4253\">Aptomat kh\u1ed1i (MCCB) so v\u1edbi aptomat t\u00e9p (MCB)<\/a> helps define when a larger frame is justified.<\/p>\n<h2>C\u00e1c c\u00e2u h\u1ecfi th\u01b0\u1eddng g\u1eb7p<\/h2>\n<h3>Can every circuit breaker be reconditioned?<\/h3>\n<p>No. Serviceability depends on design, age, damage and parts support. A breaker with cracked insulation, severe arc damage or an unknown modification may be unsafe to return to service.<\/p>\n<h3>What tests are expected after reconditioning?<\/h3>\n<p>Typical checks include visual inspection, insulation resistance, contact resistance, mechanical operations, trip timing and primary or secondary injection as appropriate. Use the maker\u2019s limits and calibrated instruments.<\/p>\n<h3>Is reconditioning the same as refurbishing?<\/h3>\n<p>Terms vary by market. Treat any process as safety-critical unless it defines inspection depth, replacement criteria, testing and documentation. Ask for a clear scope and acceptance record.<\/p>\n<h3>When should a breaker be replaced instead?<\/h3>\n<p>Replace when critical parts are unavailable, damage exceeds repair limits, fault duty has changed, or test results cannot be brought within the specified tolerance.<\/p>\n<h2>T\u00e0i li\u1ec7u tham kh\u1ea3o c\u00f3 th\u1ea9m quy\u1ec1n<\/h2>\n<ul>\n<li>IEC 60947-2 (tham kh\u1ea3o phi\u00ean b\u1ea3n hi\u1ec7n h\u00e0nh v\u00e0 ti\u00eau chu\u1ea9n qu\u1ed1c gia).<\/li>\n<li>NFPA 70B (consult the current edition and national adoption).<\/li>\n<li>IEEE C37.59 (consult the current edition and national adoption).<\/li>\n<\/ul>\n<p>Nguy\u00ean t\u1eafc l\u00e2u b\u1ec1n r\u1ea5t \u0111\u01a1n gi\u1ea3n: ch\u1ec9 \u0111\u1ecbnh m\u1ea1ch v\u00e0 b\u1eb1ng ch\u1ee9ng c\u00f9ng nhau, sau \u0111\u00f3 ki\u1ec3m tra k\u1ebft qu\u1ea3 \u0111\u00e3 l\u1eafp r\u00e1p. \u0110\u1ed1i v\u1edbi vi\u1ec7c \u0111\u00e1nh gi\u00e1 m\u00f4 h\u00ecnh, c\u00e2u h\u1ecfi \u1ee9ng d\u1ee5ng ho\u1eb7c tr\u00edch d\u1eabn c\u00f3 t\u00e0i li\u1ec7u, <a href=\"https:\/\/chac-electric.com\/vi\/contact-us\/\">li\u00ean h\u1ec7 \u0110i\u1ec7n l\u1ef1c CHAC<\/a> v\u00e0 chia s\u1ebb c\u00e1c y\u00eau c\u1ea7u v\u1ec1 ch\u1ebf \u0111\u1ed9 l\u00e0m vi\u1ec7c, \u0111i\u1ec7n \u00e1p v\u00e0 th\u1ecb tr\u01b0\u1eddng ti\u00eau th\u1ee5.<\/p>","protected":false},"excerpt":{"rendered":"<p>This guide explains low voltage power circuit breaker reconditioning, including inspection, approved parts, testing and safe return-to-service decisions.<\/p>","protected":false},"author":1,"featured_media":4224,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4226","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":8}},"acf":[],"_links":{"self":[{"href":"https:\/\/chac-electric.com\/vi\/wp-json\/wp\/v2\/posts\/4226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/chac-electric.com\/vi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/chac-electric.com\/vi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/chac-electric.com\/vi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/chac-electric.com\/vi\/wp-json\/wp\/v2\/comments?post=4226"}],"version-history":[{"count":2,"href":"https:\/\/chac-electric.com\/vi\/wp-json\/wp\/v2\/posts\/4226\/revisions"}],"predecessor-version":[{"id":4298,"href":"https:\/\/chac-electric.com\/vi\/wp-json\/wp\/v2\/posts\/4226\/revisions\/4298"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/chac-electric.com\/vi\/wp-json\/wp\/v2\/media\/4224"}],"wp:attachment":[{"href":"https:\/\/chac-electric.com\/vi\/wp-json\/wp\/v2\/media?parent=4226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/chac-electric.com\/vi\/wp-json\/wp\/v2\/categories?post=4226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/chac-electric.com\/vi\/wp-json\/wp\/v2\/tags?post=4226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}